How to Choose a Linear Actuator Manufacturer for Equipment OEM Projects

Choose an OEM linear actuator manufacturer by verifying that it can turn your equipment requirements into an acceptable configuration, repeat that configuration in subsequent batches and take clear responsibility for changes and issues. Review requirements, responsibilities, technical evidence, manufacturing, validation and long-term supply in sequence. Support each decision with documents, review outcomes and open items; maximum force, price or one successful sample is not enough on its own.

Stage Evidence for the decision
1. Define operating requirements and non-negotiable conditions The requirement brief has an identified revision, with mandatory conditions, open items and owners recorded. Conditional technical discussions may begin, but unverified assumptions are not selection conclusions.
2. Establish supplier control and accountability Key responsibilities have named owners, and the buyer knows where technical and delivery issues are escalated. Unclear subcontracting or approval authority remains open for review.
3. Verify the proposed configuration against the application The proposed configuration is identifiable and linked to its documents. Unknown fit, electrical, loaded-speed and operating conditions have an evidence or sample-check plan. Unsupported performance remains unconfirmed.
4. Review manufacturing consistency through a unit-to-record trace Actual records demonstrate configuration and batch traceability, and unit, batch and model-level checks have defined scope. Missing records or revision discrepancies have owners and closure actions. A factory visit or certificate alone is not sufficient approval.
5. Validate the configuration and process through samples and a pilot Mandatory checks have results and review decisions, with issues closed or explicitly restricted and assigned. Record the approved configuration and process before the next stage. Strong scores elsewhere cannot offset an unmet critical requirement.
6. Align the quotation and agree long-term supply responsibilities Quotation scope matches the configuration, and required documents, change notifications, issue handling and ongoing support have written arrangements. Uncommitted items remain open rather than being assumed included.

1. Define operating requirements and non-negotiable conditions

Describe what moves, how it is supported and where the actuator attaches. Record push and pull requirements separately when both are relevant. Include travel, mounting space, required movement time, operating frequency, power supply and the control arrangement.

Use the existing electric linear actuator selection guide for the technical selection sequence. For mounting measurements, use the stroke length measurement guide. This supplier checklist starts with those inputs; it does not replace the equipment design calculation.

Requirement Useful attachment Question for the manufacturer
Load and movement Mechanism sketch and operating positions. Which proposed configuration is suitable for review against this load path?
Stroke and installation Mounting-point distances and clearance drawing. Does the proposed drawing fit at both ends of travel?
Speed and use pattern Required movement time, on/off times and duty conditions. What performance data apply at the requested load and supply?
Electrical and mounting Supply, controller, feedback and connection details. Which interface and mounting choices are included in the quotation?

Separate requirements into mandatory, open to alternatives and not yet defined, assigning an owner to each unknown. Include the environment, target market, required documents and consequences of failure. Have the project engineering team determine design margins and acceptance limits for the application rather than applying a universal multiplier.

Load and movement evidence

Ask for: A mechanism sketch, actuator mounting points and operating positions; ask for separate responses to push, pull and stationary holding requirements.

How to judge: Look for the requirements reviewed, the calculation or test referenced and any unknown conditions. Mark a reply such as “the maximum force is sufficient” as clarification needed if it does not address the mechanism.

If unclear, ask: Which operating position is most demanding, what supports this configuration choice and which inputs do you still need from us?

What should be established before the next step?

The requirement brief has an identified revision, with mandatory conditions, open items and owners recorded. Conditional technical discussions may begin, but unverified assumptions are not selection conclusions.

2. Establish supplier control and accountability

Whether evaluating a manufacturer, integrator or distributor, establish who controls the design, organizes production, approves changes and coordinates issue resolution. Making every component in-house is not the sole criterion; assess whether the supplier controls its promised scope and explains its dependencies on other companies.

Ask the supplier to identify who handles technical approval, order configuration, batch release and support escalation for this project. Redacted records or demonstrations during an on-site or video review may protect confidential information; refusal to disclose a complete BOM is not by itself evidence of inadequate manufacturing capability.

Who owns design, production and issue resolution?

Ask for: A responsibility list naming the contracting supplier, design owner, production site, key outsourced activities and technical approval and escalation contacts.

How to judge: Look for an accountable party and supporting records for each responsibility. Manufacturers, integrators and distributors should explain what they control and where they depend on others; business type or in-house production of every part is not a sufficient selection rule.

If unclear, ask: If a drawing changes or a batch has an issue, who can approve the change, who investigates and who provides the final written response?

What should be established before the next step?

Key responsibilities have named owners, and the buyer knows where technical and delivery issues are escalated. Unclear subcontracting or approval authority remains open for review.

3. Verify the proposed configuration against the application

A product family can contain several voltage, gearing and force options. Comparing one option’s maximum force with another option’s maximum speed can produce a configuration that the document never promises.

For a concrete reading example, the 398H1 technical table includes a 24 V, 6,000 N row with 5.0 mm/s no-load speed and 3.5 mm/s loaded speed. The table notes a 25°C test environment. These figures belong to that row; they are not a promise for every 398H1 or every application.

Ask the supplier to mark the proposed row or configuration code and explain any missing test condition. For installation dimensions, obtain the drawing for the actual stroke and end fittings rather than calculating from a generic family statement.

A matching stroke does not establish fit

Ask for: A drawing for the selected stroke and end fittings, showing retracted and extended mounting distances, mounting-hole dimensions, the envelope and cable exit.

How to judge: First match the drawing to the model, configuration and revision. Have the equipment team check fit and clearance throughout travel. “We can supply that stroke” does not confirm the installation space.

If unclear, ask: Please mark both end-position mounting distances on the drawing and confirm that its end fittings and cable exit match the quotation.

Control interface clarity

Ask for: Supply and controller information, cable and connector drawings, pin assignments and feedback details where required.

How to judge: The reply should map each interface requirement to the proposed configuration and its documentation. Matching voltage or connector shape alone does not establish electrical and control compatibility. Do not trial-connect an undocumented interface.

If unclear, ask: Please provide the proposed cable pin assignments and explain how they map to our controller inputs, outputs and feedback requirements.

Force and speed from the same configuration

Ask for: A marked specification row or performance curve identifying the proposed configuration, voltage, load, speed definition and test conditions.

How to judge: Compare values for the same configuration and operating conditions. Family-wide maximum force and maximum speed do not show whether the quoted option meets both requirements.

If unclear, ask: Please identify the quoted configuration’s speed at our specified load. If that data is unavailable, can an appropriate sample check be agreed first?

Operating frequency and duty conditions

Ask for: The proposed configuration’s permitted operation and rest conditions, plus a written response to the project’s movement duration, repetition and environment.

How to judge: Check for a defined continuous run duration, rest schedule and applicable conditions. A duty-cycle percentage without its time basis or conditions needs clarification; it does not establish continuous operation.

If unclear, ask: Given our movement duration and operations per hour, what rest schedule is required and where is it documented?

Test evidence relevant to the purchase

Ask for: For a claimed force, speed or service-life rating, request the report or data tied to the tested model, configuration and revision. For an endurance or cycle-life claim, ask for sample count, load and direction, supply, stroke, cycle definition, duty/rest pattern, temperature, test method, pass/fail criteria, test duration and results.

How to judge: Distinguish a calculated estimate, published rating and endurance-test result. A cycle count is not comparable without its definition and conditions; another configuration’s report does not establish the quoted one. Review failures and exclusions as well as passing results, then decide whether the evidence represents your application. A test result is not a universal service-life guarantee.

If unclear, ask: Is the service-life figure estimated or endurance-tested? Which configuration and cycle conditions were used, how many samples were tested, what were the pass/fail criteria, and can you provide a redacted report for the quoted configuration?

Example: does adequate no-load speed meet the movement-time requirement?

Illustrative purchasing scenario, not a customer case or verified RUNDA product performance.

Assume the actuator must travel 100 mm along its axis within 10 seconds under a specified load. The supplier replies only, “No-load speed is 12 mm/s.”

This does not establish compliance. 100 ÷ 10 = 10 mm/s is the minimum average speed needed over that travel; the no-load figure does not describe performance at the specified load or account for starting, stopping or control delays.

Follow up: please provide speed data for the proposed configuration at the specified load and supply, and agree exactly when timing starts and ends.

If matching data is unavailable, agree a sample check requiring total movement time over 100 mm at the specified load to be no more than 10 seconds. Decide from the measured result under the agreed conditions; this example does not establish that any RUNDA model meets the requirement.

What should be established before the next step?

The proposed configuration is identifiable and linked to its documents. Unknown fit, electrical, loaded-speed and operating conditions have an evidence or sample-check plan. Unsupported performance remains unconfirmed.

4. Review manufacturing consistency through a unit-to-record trace

After a sample performs well, ask how the next batch will be produced to the same requirements. Select a sample or recent delivered unit and trace its label to the order configuration, controlled drawings, applicable material batches, process records and inspections. This is more informative about record gaps and revision differences than factory photos alone.

Focus the review on this project’s critical requirements. Installation dimensions should connect to drawings and measurement records; cables and connectors to the approved configuration; performance results to their test conditions. Agree which records are needed, how they can be redacted and who reviews them for the buyer.

Ask how the approved sample configuration will be identified in the quotation and future orders. A useful record includes the model, stroke, voltage, force/speed option, mounting drawing revision, cable and connector, feedback option and agreed documentation.

An approved sample configuration that can be reordered

Ask for: A revision-controlled configuration record linking the sample identifier, drawings, cable, connector, feedback option and quotation.

How to judge: The production order should trace to the approved sample configuration. A shared series name is insufficient. Where no unique ordering code exists, require a written configuration and document revisions.

If unclear, ask: Which ordering identifier should we use for repeat purchases, and which approved configuration record and drawing revisions will the order reference?

Can one physical unit be traced to its batch and configuration?

Ask for: Choose a sample or recent delivered unit and ask for its label or batch identifier to be linked to the order configuration, drawing revision, key material batches and inspection records. Redacted records are acceptable.

How to judge: Check that the records describe the same product and revision. For batch-level traceability, establish which units and materials the identifier covers. Blank forms do not demonstrate connected records.

If unclear, ask: Please demonstrate the lookup from this unit’s identifier. If an issue is found, how would you identify the affected batch and other potentially affected deliveries?

Are critical operations carried out to controlled requirements?

Ask for: Instructions, fixture or tool controls, measurement methods and recent execution records relevant to the project’s critical requirements. A complete confidential BOM is not necessary for every review.

How to judge: Select an operation affecting the project and compare the instruction revision, required values and execution records. Equipment or promotional photos show facilities, not evidence that the operation followed the requirements.

If unclear, ask: At which operation is this requirement controlled, which instruction revision is used and how are exceptions isolated and recorded?

Are unit checks, batch sampling and design validation distinguished?

Ask for: An inspection plan identifying the stage, applicable model or configuration, coverage or sampling arrangement, acceptance criteria and records for each check, with matching examples.

How to judge: Separate checks on every unit, batch sampling and model or design validation. Do not require every unit to undergo all life or environmental tests, or treat a model report as release evidence for every batch.

If unclear, ask: For an actual batch, which records cover every unit, which cover sampled units and how is the batch handled if a check fails?

What should be established before the next step?

Actual records demonstrate configuration and batch traceability, and unit, batch and model-level checks have defined scope. Missing records or revision discrepancies have owners and closure actions. A factory visit or certificate alone is not sufficient approval.

5. Validate the configuration and process through samples and a pilot

Write down the checks that determine acceptance before a sample arrives. Each check needs the configuration, method, condition, recorded result and reviewer. The equipment team should define its acceptance limits; a supplier’s general brochure should not silently set them.

Check Conditions to record Evidence to keep
Movement under load Actual load path, supply, orientation and travel. Measured movement time and observations.
Fit and clearance Both end positions, mounting parts and cable route. Marked drawing and equipment photos.
Operating pattern On/off schedule, ambient conditions and controller settings. Test record with conditions and any interruptions.
Control functions Controller and feedback version, intended commands. Action list and sample configuration identifier.

The RUNDA testing capability page describes available test areas. Ask which tests are relevant and what report can be supplied for your project. A listed capability does not show that every model has passed every test under your conditions.

Sample evaluation primarily asks whether this configuration meets the requirements under agreed conditions. A pilot also asks whether the proposed production process can repeat the result. These purposes are related but not interchangeable; a pilot should do more than repeat a single-unit demonstration.

Before the pilot, agree the configuration, production route, checks, rationale for quantity and issue-handling process. Retain individual results rather than only averages. Identify manual adjustments, temporary materials or special inspections that differ from the intended production process, and agree how those differences will be evaluated.

Defined sample acceptance criteria

Ask for: An agreed sample checklist with conditions, methods, acceptance limits, records and responsible reviewers for each item.

How to judge: Before the sample arrives, each item should have a clear pass or fail decision. Statements such as “runs normally” or “good quality” do not replace defined checks.

If unclear, ask: What constitutes a pass for this item? Please specify the conditions, recorded data and who reviews the result.

Traceable sample results

Ask for: Sample-label photos, configuration or serial identification and measurement records. If video is supplied, identify the test it accompanies.

How to judge: Another reviewer should be able to identify the sample, load, supply and measured result. A movement video without conditions and measurements does not establish that a performance requirement was met.

If unclear, ask: Please connect the video and measurements to the sample identifier and provide the load, supply and actual movement time.

Unresolved issues and retesting

Ask for: Failed-check or interruption records, the investigation, corrective action and results from repeating the affected check.

How to judge: “Resolved” needs supporting retest evidence. Record configuration changes, whether conditions stayed comparable and whether other acceptance items are affected. Keep unresolved items open.

If unclear, ask: Which part or configuration changed? Please provide the retest record and identify any other checks that need to be repeated.

Does the pilot evaluate the proposed production process?

Ask for: An agreed pilot configuration, production route, participating batches, rationale for quantity, checks and acceptance criteria. Retain results showing variation between units and batches.

How to judge: Establish how pilot materials, operations and inspections relate to the intended production process. Set quantity by project risk, sources of variation and validation purpose rather than a universal unit count. One passing batch does not establish service life or all future batch performance.

If unclear, ask: Which production risks will this pilot evaluate? If differences appear, how will units be contained, causes investigated and results rechecked before the next-stage decision?

Example: a movement video is not yet a completed acceptance record

Illustrative purchasing scenario, not a customer case or verified RUNDA product performance.

The supplier sends an extension-and-retraction video and writes, “Test passed.” There is no matching sample identifier, load, supply or timing record.

Record clarification needed rather than passed. The video is supporting observation, but does not yet trace to the quoted configuration and acceptance conditions.

Follow up: please provide the sample label, configuration revision and test record, linking the load, supply, travel, measured time and reviewer to this test.

Compare the response item by item with the agreed acceptance checklist. Complete evidence may close that item; untested items and unresolved issues remain open.

What should be established before the next step?

Mandatory checks have results and review decisions, with issues closed or explicitly restricted and assigned. Record the approved configuration and process before the next stage. Strong scores elsewhere cannot offset an unmet critical requirement.

6. Align the quotation and agree long-term supply responsibilities

Attach the operating brief, drawings or photos, expected sample and order quantities, target country and required documents. State which requirements are mandatory and which are open to alternatives. Ask each supplier to return the proposed configuration, included items, exclusions and unresolved questions.

For an OEM decision, a quotation is ready for comparison when you can trace its proposed product back to the same requirement and sample plan. If a supplier changes the stroke, speed option or control interface, record that difference before comparing price.

Discuss how proposed changes will be communicated and when a new sample or equipment review would be required. Ask for the actual support route for installation questions, replacement parts and reported faults. Obtain the applicable commercial and service terms in writing; do not infer service life or warranty from a test capability page.

Turn long-term responsibilities into workable arrangements: applicable models, notification triggers, recipients, approval owners, required information and how unresolved matters are handled. Negotiate notice periods, spare-parts duration, service costs and response arrangements for the project; a general guide should not assign fixed commitments on the supplier’s behalf.

Changes identified before supply

Ask for: The supplier’s change-notification arrangement, including affected orders, notification details, buyer review and cases requiring new samples.

How to judge: Look for who is notified, when buyer acceptance is needed and how affected configurations are identified. “Same performance” does not explain the effects of material, interface or drawing changes.

If unclear, ask: If the cable, connector or drawing revision changes, how will you notify us before supply and when is a new sample review required?

A usable support route

Ask for: Contacts for installation and fault reporting, required information and applicable spare-parts and service terms.

How to judge: The buyer should know whom to contact, what records or photos to send and who owns the next step. Compare written terms; “after-sales support” does not establish free replacement, warranty duration or response time.

If unclear, ask: For a field fault, what information should we send, who handles technical review and what conditions apply to replacement or repair?

Comparable quotation scope

Ask for: An itemized quotation identifying the actuator configuration, associated parts, sample and production quantities, documents, customization and exclusions.

How to judge: Map each offer to the same purchasing list. An actuator-only offer and an offer including controls, cables or brackets cannot be compared solely by total price. Clarify unlisted items.

If unclear, ask: Please mark each requested item as included, optional or unavailable and list anything else needed for the complete configuration.

Explained alternatives and deviations

Ask for: A deviation list identifying changes to the requested stroke, speed configuration, mounting parts or feedback arrangement.

How to judge: An alternative can remain a candidate if its effects on interfaces, drawings and sample checks are clear. “Equivalent replacement” is not evidence of a verified drop-in fit.

If unclear, ask: Which mechanical, electrical or control requirements change, and which drawings or sample checks should we review again?

Complete commercial terms

Ask for: Written confirmation of quote validity, quantity conditions, included documents, packing and shipping scope, payment and delivery arrangements.

How to judge: Compare offers at the same quantity and delivery scope, separating committed terms from open points. Do not pass unconfirmed lead times or quantity conditions on as commitments to your customer.

If unclear, ask: What quantity and delivery scope does this price cover, and which dates or costs are confirmed or dependent on configuration approval?

Are discontinuation, spares and continuity arrangements written down?

Ask for: Agreed change and discontinuation notification arrangements, spare-parts scope, expected support period, alternative-configuration review and contacts and actions for supply disruption.

How to judge: Check applicable products, owners, triggering conditions and uncommitted items. “Long-term supply” is not an indefinite spares guarantee. Alternatives still require installation, control and relevant validation reviews.

If unclear, ask: If a key component becomes unavailable or a model is discontinued, who notifies us and under what conditions? How are spares or alternatives approved, and which costs and timeframes still need agreement?

Example: the same model name, but a changed connector

Illustrative purchasing scenario, not a customer case or verified RUNDA product performance.

The first sample uses an approved connector. A repeat-order quotation uses the same model name, but the new drawing shows a different connector. The supplier says, “The function is unchanged.”

Record the configuration deviation before treating this as an approved repeat order. The model name alone does not explain whether the connector fits the existing equipment.

Follow up: list the changes against the approved sample, provide old and new connector drawings and pin assignments, and identify affected orders and any need for a new sample.

Have the project team assess interface and installation effects, then decide which reviews or sample checks are needed. Record the decision and new revision in the approved configuration record and reference it in subsequent orders.

Example: a cheaper quotation may simply exclude supporting parts

Illustrative purchasing scenario, not a customer case or verified RUNDA product performance.

Assume supplier A quotes only the actuator, while supplier B includes the actuator, cable and mounting parts. Both reply, “Meets your requirements.”

Align the purchasing scope before ranking the totals. List the actuator configuration, cable, mounting parts, documents and sample testing separately, marking each as included, optional or missing.

Follow up: please re-quote against this list and identify exclusions, quantity conditions and delivery scope.

Compare price after scope and terms are aligned. Record how any required item that a supplier cannot provide will be handled; a lower total does not mean missing items are included.

What should be established before the next step?

Quotation scope matches the configuration, and required documents, change notifications, issue handling and ongoing support have written arrangements. Uncommitted items remain open rather than being assumed included.

Frequently asked questions

What information is needed to select a linear actuator?

Provide the application and mechanism, push/pull requirements, stroke, mounting space, speed under load, operating pattern, supply, controls and environmental conditions. Mark unknowns for engineering review.

How do stroke length and installation length differ?

Stroke describes travel. Installation length describes the relevant mounting distance in a stated position. Use the existing measurement guide and the configuration drawing; do not treat the two dimensions as interchangeable.

What should OEM buyers ask an actuator manufacturer?

Ask which configuration is proposed, which evidence supports it, how the sample will be evaluated, how repeat orders are identified and how changes and service questions are handled.

How can an OEM buyer evaluate production consistency?

Ask the supplier to trace a physical unit’s identifier to its order configuration, drawing revision and inspection records, then review critical operations and the inspection plan. Follow sample evaluation with an agreed pilot of the intended production process. Photos, a management-system certificate or one sample alone do not establish consistency across all batches.

Does a pilot need a fixed quantity or a universal passing score?

Do not adopt a universal quantity or score without a project basis. Define the risks, sources of variation, checks and acceptance criteria before agreeing the pilot scope. Scores can help compare candidates, but unmet critical requirements need explicit resolution rather than compensation by points in other categories.

Related RUNDA products and guidance

Browse linear actuator models, inspect the 398H1 product page and download its original data sheet. Use Technical Resources or send RUNDA an OEM requirement brief.

For a second model, review the 398H2 product page and its current English data sheet. Keep each document attached to its own model and configuration.